Talk to Sales
The Play · Manufacturing Reps

For independent mfg reps.

If you are an independent manufacturers rep, here is the exact play. Stop waiting for the buyer to send the RFQ. Start owning the engineering relationship months before the spec gets written.

A manufacturing rep on the factory floor with a plant ops manager reviewing a part on a tablet
Watch the play
90 sec
Who · The Audience

Plant + ops leads at OEMs in your territory.

Companies running real production lines. People on the floor who decide what gets specified.

  • Automotive / EV · Tier 1, Tier 2, battery, BIW
  • Aerospace · build-to-print, AS9100, long lead
  • Industrial OEM · pumps, valves, motors, hydraulics
When · The Trigger

Buyers open the spec back up.

Three windows where buyers re-evaluate parts they have been buying the same way for years.

  • New plant manager · fresh supplier audit
  • New product line · spec is being written now
  • Reshoring or supply disruption · last supplier broke
How · The Message

Technical. Application-specific.

Name the plant. Reference one engineering detail. A material substitution. A tolerance. A lead time match.

  • No quote
  • No catalog
  • The right insight at the moment they will spec something new

Want this play for your book?

Book twenty minutes with our team. We will map your existing book, build the trigger campaigns, and show you the math for your specific motion.

Other plays you might recognize